Project Cases
China Communications Construction Company First Navigation Bureau Installation Engineering Co., Ltd.
Nantong Port Tiansheng Port Area Henggang Sha Operation Zone 100,000-ton Grain and Oil Berth Project – Loading and Unloading Process Equipment System Project
In 2022, to meet the demand for establishing grain and oil enterprises in the hinterland and further enhance service capabilities in the middle and upper reaches of the Yangtze River, the Henggangsha Base of Nantong Port launched a grain and oil berth project with a capacity of 100,000 tons. The project plans to construct one 100,000-ton berth, one 30,000-ton berth, and seven 5,000-ton berths, with a designed annual throughput capacity of 11.8 million tons of grain, oil, and other agricultural products. Our company’s low-voltage switchgear products—thanks to their high reliability, intelligent configurations, and customized services—have become critical infrastructure ensuring the stable operation of the project and providing solid power support for the port’s loading and unloading equipment.